Top
Activity Fields

News

Home / News / The construction of an earthen dam for the needs of agriculture of Andreevsky district, Belgorod region has been completed.
17 April 2015

The construction of an earthen dam for the needs of agriculture of Andreevsky district, Belgorod region has been completed.

For the needs of agriculture and land reclamation in the Belgorod region completed the construction of an earthen dam.  The dam is partially washed, partially filled out of sandy and loamy soils, from the upstream side is protected from erosion by waves of reinforced concrete slabs, equipped with a drainage system that includes vertical and horizontal drainage, shaft-beam drainage, drainage ditch, pumping station. The length of the dam is 4000 m, the maximum height is 40 m.on the main section with a length of 3250 m, the dam has a width of 340 m at the base and a crest of 18 m. 28,004 million m3 of soil is poured into the dam. A category III road with a width of 12 m is laid along the crest of the dam.

Gallery


← Previous

26 December 2014

Quality Management System of JSC "SU-EnergoGrupp" is certified

Next →

20 August 2015

The construction of irrigation canals, pipeline irrigation systems and water intake facilities in the Kirov region has been completed.
© 2014 – 2024 SU-EnergoGrupp
Website created – Company "Alma", 2014